Project Scope
1. Investigation of Existing Infrastructure
- Assessing the current condition of electrical infrastructure on catwalks, berthing dolphins, and mooring dolphins, including:
- Capstans, mooring hooks, and associated infrastructure (including any IS)
- Lighting systems
- General power supply
- All feeds to the above components
- Connection to the main board in the control room at the head of the jetty
- Evaluating capacity within the main board for proposed demands
2. Design and Installation
- Designing, installing, and commissioning breasting dolphin quick release hooks and capstans
- Implementing permanent upgrades to electrical infrastructure to comply with current standards, including considerations for hazardous areas where applicable